This calculator prices a 12-month fixed electricity, gas or dual fuel product for a home, cost by cost, and gives you a fully linked, self-checking Excel workbook that proves it. All figures exclude VAT, and everything runs in your browser: nothing is sent anywhere.
You do not need to know the charging rules. Work down the form from 01 to 07, watch Your 12-month product beside it, and download the workbook when you are ready. Sections 08 and 09 show where the money goes and how the regions compare, 10 checks a real tariff and 11 shows the price history; the How it works guide explains every cost in full.
The form describes the contract and the costs to include. The Your 12-month product panel recalculates as soon as you change anything, and Download XLSX builds the workbook for exactly what is on screen. On a phone the panel sits below the form, and a bar at the foot of the screen keeps the total in view: Details and download jumps to the panel.
Abbreviations have a dotted underline: hover over one, or tap it, to see what it means. The Glossary lists them all.
Choose Electricity, Gas or Dual fuel (the default). Dual fuel prices both for the same home, region, payment method and start, each with its own consumption, profile and costs, and adds them into one product. The parts of the form for a fuel you have not chosen are hidden.
Great Britain has 14 electricity network areas. Each DNO (distribution network operator) sets its own DUoS charges, NESO's TNUoS unit rate differs by area, and so do losses, so the same home's costs vary by region. Average of all 14 (the default) prices every region in full and takes the simple average, each region counting equally; One region prices the area you pick and names its distributor.
For gas, each region is a mix of the 13 LDZs (local distribution zones) of the 8 gas distribution networks, in Ofgem's shares of each region's supply points. The South West, for example, is almost all the South West LDZ of Wales & West Utilities.
The profile is how the home's electricity use spreads through the day and the year, which decides how much of it falls in each charging window. One profile is used for every cost, and every result names it.
Gas has its own profile. Typical gas home (Xoserve profile, EUC band 1), the default, follows Xoserve's domestic load profile for your region's LDZs, month by month, for every cost. The Ofgem price cap method uses Ofgem's quarter demand weights for wholesale gas and its summer and winter shares (24.7% and 75.3%) for the other costs, and with Ofgem's own inputs it rebuilds Ofgem's published gas allowances. The chart shows each month's share of your gas use.
Direct Debit (the default), Standard Credit (paying each bill when it arrives) or Prepayment. Ofgem sets the supplier allowances separately for each, so only operating costs, debt-related costs, EBIT and levelisation change. For the South West from December 2026, the typical single-rate home (Ofgem price cap) costs £1,048.08 on Direct Debit, £1,127.67 on Standard Credit, mostly because of its higher bad debt, and £1,022.72 on Prepayment, whose higher operating costs are more than offset by levelisation, lower bad debt and a larger smart metering credit.
Electricity used in a year, from 100 to 20,000 kWh (day and night together for Economy 7). The box starts at 2,500 kWh and keeps your figure when you change the profile; Use typical for this profile sets the profile's typical figure: Ofgem's benchmarks of 2,500 kWh for a single-rate home and 3,400 kWh for Economy 7, 4,700 kWh for the electric car homes (2,500 plus about 2,200 kWh of home charging) and 6,000 kWh for the heat pump home (2,500 plus about 3,500 kWh). The profile's shape is scaled to whatever you enter.
Gas has its own box, from 100 to 73,200 kWh a year (the top of the domestic band), starting at Ofgem's typical 9,500 kWh. It also sets the supply point's peak-day capacity, which the capacity charges are based on: 9,500 kWh in the South West is a peak day of 96.4 kWh (load factor 27.0%).
The contract starts on the 1st of the month you pick and runs for 12 months, from December 2026 to April 2029. The list starts with the month after the latest wholesale curve, so it moves on as the curve is refreshed. Network charges change every 1 April, so most contracts span two charging years: the timeline shows each year's share of your days and of your consumption. Fixed charges follow the days; unit charges follow the consumption, which both Ofgem's method and the Elexon profiles weight towards winter.
Energy bought on is the day the year's energy (and, in dual fuel, the gas) is bought: Last five days (the default), the last five working days up to the latest curve, Thursday 12 November 2026, Friday 13 November 2026, Monday 16 November 2026, Tuesday 17 November 2026 and Wednesday 18 November 2026, weighted equally; or any one saved settlement day, newest first, from the last five back to the earliest day with a saved curve. Electricity alone can offer a day gas does not have; if you switch to gas or dual fuel with such a day chosen, it goes back to Last five days. Each day is priced with its own forward curve: for the South West example the dual fuel product is £2,057.51 if bought on Wednesday 18 November 2026 and £2,200.13 on Thursday 12 November 2026, against £2,130.90 for the last five. The choice applies to every start month; a single day is named in the results panel and the workbook, and adds _bought-YYYY-MM-DD to the file name.
Some later periods rest on forecasts or assumptions. They are tagged on the timeline and on each cost in section 07:
| Cost | From | Rates used |
|---|---|---|
| DUoS | 2028/29 | Indicative: the DCUSA Cost Information Review Packs (September 2026) |
| TNUoS | 2027/28 | NESO forecasts |
| BSUoS | April 2027 | NESO's forecast tariffs from its BSUoS Forecast for November 2026 |
| BSUoS | April 2028 | Assumed: 16.78 £/MWh in summer and 15.90 £/MWh in winter |
| Capacity Market | September 2028 | Assumed: costs carried forward from the 2027/28 delivery year |
| CfD | April 2027 | LCCC's base-case forecasts, repriced to the same forward curve as the wholesale cost |
| CfD | October 2028 | Assumed: LCCC's forecasts for October 2027 to September 2028 repeated, repriced in the same way |
| RO, FiT and AAHEDC | April 2027 | Assumed: the RO buy-out price and the FiT and AAHEDC rates uplifted by RPI |
| WHD | April 2027 | Ofgem's 2026/27 rate carried forward |
| NCC | Throughout | Assumed: April 2026's levy fund × 6 |
| nRAB | April 2028 | Assumed: LCCC's forecast rates for April 2027 to March 2028 repeated |
| Supplier allowances | April 2027 | Operating costs follow the OBR's CPIH forecasts; DCC's charges are indicative, then held; the smart metering part holds Ofgem's April to September 2027 values from October 2027; the cost of equity behind EBIT and debt is held at 12.67% |
| Gas distribution and NTS exit capacity | 2027/28 | The indicative notices of all 8 networks; in a year without a network's own notice, its latest notice grown with its allowed revenue (Ofgem's RIIO-3 Final Determinations), and exit capacity with National Gas's indicative reserve prices |
| Gas NTS Commodity | October 2027 | National Gas's indicative rates |
| Green Gas Levy and gas WHD | April 2027 | The 2026/27 rates carried forward |
The costs come in five groups for each fuel: wholesale, network costs (for electricity DUoS, TNUoS and BSUoS), policy costs (for electricity the Capacity Market to nRAB), supplier allowances (operating costs, industry charges and debt-related costs; called operating costs when an Elexon or illustrative profile, or for gas the Xoserve profile, is chosen) and other (EBIT and levelisation). Each group starts closed, showing how many of its costs are ticked, what they add and how many are moved (see Recovered in, below); click its name to open it, and tick the costs to include.
Every cost in your product as its £ value for the 12 months and its share of the total, grouped as in section 07, with the bars on one scale, a subtotal for each group of more than one cost and, in dual fuel, each fuel's total. Unticked costs are listed underneath, and for the average of all 14 regions each cost is the simple average of the regions'. The table starts closed: its heading shows the number of costs and the total; click it to open the table. Under the wholesale, DUoS and TNUoS rows, indented, are their lines with their own bars and shares; they are part of that cost, not added again.
Sections 09, 10 and 11 start closed: click a section's title to open it, and again to close it. They stay as you left them while the inputs change. The same product in all 14 regions, cheapest first, against the average of all 14. Each bar shows how much cheaper (to the left) or dearer (to the right) a region is than the average, with its total and the difference; the region you picked is highlighted. In dual fuel it compares the dual fuel product.
A household in the South West using 2,500 kWh a year, on a contract starting 1 December 2026, with the typical single-rate home (Ofgem price cap) and Direct Debit, on the wholesale curve of 18 November 2026:
Starts closed; click its title to open it. Suppliers quote a tariff as its cost for a year at Ofgem's typical consumption: 2,500 kWh of electricity for a single-rate home (3,400 kWh for Economy 7) and 9,500 kWh of gas. Enter that figure for a real tariff, one for each fuel in dual fuel, and the tool shows the margin it implies. It works the product out at the same typical consumption, with your region, profile, payment method, start month, buying day and ticked costs, whatever you entered in section 05.
Starts closed; click its title to open it. The pipeline keeps the forward curves of every settlement day it has collected (one a working day since mid-October 2026, gas since late October). Section 11 prices your product on each of them, as if all its energy were bought that day, so you can see how it has moved with the market.
Choose an Excel theme (Light or Dark) and press Download XLSX. The file name records your choices, for example Energy-bill_South-West_PriceCap-single_DirectDebit_2500kWh_from-2026-12_Wholesale-DUoS-TNUoS-BSUoS-CM-CfD-RO-FiT-AAHEDC-WHD-NCC-nRAB-Supplier.xlsx; gas and dual fuel workbooks start Gas-bill_ and Dual-fuel-bill_ and end _all-costs when every cost is included. Then come any of these endings, in this order: _2-costs-moved when costs are moved to the standing charge or the unit rate (here two), _tariff-check when the workbook has a Tariff Check tab, _bought- and the day for a workbook bought on one day, and _dark for a Dark workbook.
Each table and graph has a small Excel button by its title, shown when the table or graph is: By cost in the results panel, the lines under Wholesale energy, DUoS, TNUoS and Wholesale gas in 07, the cost breakdown (08), the region comparison (09), the tariff check (10), the price history's charts and its table (11), and every table in the Cost rates panel. Each builds a one-sheet workbook in the scottishpawel.com colours, for what is on screen: a header with your inputs and the prices' date, the table as shown, its totals, shares and differences as formulas (so they update if you change a figure), and, where the page draws a graph, the same graph as a native Excel chart linked to the cells. The cost rates tables keep each value as a number, in the format shown on the page. File names start scottishpawel_, then the table, the fuel, the region and the start month, for example scottishpawel_cost-breakdown_Dual-fuel_South-West_from-2026-12.xlsx. These workbooks are always light; the Excel theme applies to Download XLSX.
Headings sit in columns A to D and everything else from column E, and the tabs are grouped by coloured dividers. Yellow cells are inputs you can change, blue text is linked from another tab, black text is a formula on that tab, and underlined text is a link. Change the consumption in the workbook and every cost and the product recalculate.
Each kind of tab has its own colour, and each group of tabs starts with a divider tab (Results>>>, Inputs>>>, Data>>>, Calculations>>> and Check workings>>>). The colour also runs across the top row of every tab, with the kind of tab named in it, because Excel shows the colour of the tab you are on only as a thin line. A tab's name starts with the cost it belongs to; a source data tab ends in "Data"; a calculation tab is the cost's name; and a check tab says what it checks.
Every tab except the README and the dividers opens with About this tab, folded: click + in the left margin to open it. It says what the tab is or does; for a source data tab, what the data is, where it is from and how it is used; then step by step, the tab's own numbered steps (each a link) with the arithmetic in words: what is multiplied by what, and what is added or taken away; and what the tab gives. Every tab's sections are numbered Step 1, Step 2 and so on (steps shared by several blocks are Shared step 1, and the average of the 14 regions has one block per region, numbered 4.1, 4.2 and so on), with a Check where the tab reproduces Ofgem's published figure. Each calculation tab then has At a glance: its result (fixed, unit and total £, p/day and p/kWh), the status of its checks, and the tabs it uses and the tabs it feeds. Divider tabs say that they are dividers. Long blocks of detail are folded: click + in the left margin to open one. Rates are shaded by status, the same colours as in See all cost rates: final or set green, draft or forecast blue, indicative orange and assumed red. Every tab prints landscape, one page wide (two for the widest), with its title on every page.
The kinds of tab, in the order they come:
A gas workbook has the same layout and colours, its tabs starting "Gas": the Gas Calendar, the quotes, Gas Wholesale Shape (the monthly shape), and the wholesale, demand, network, policy and supplier data as source data; the curve, Gas Wholesale (which also prices the earlier buying days from their own curves), Gas Network, Gas Policy and Gas Supplier Costs as calculations; and the Gas Network Ofgem Check (Ofgem's network allowance rebuilt for every region) and the Gas Supplier Ofgem Check as check workings. A dual fuel workbook starts with the two fuels together: its README and Checks, then its Results, the Summary (the fuels side by side) and the Dual Fuel Product tab, which adds them. Then come the Electricity>>> divider and every electricity tab, starting "Elec", and the Gas>>> divider and every gas tab, starting "Gas". Each fuel keeps the order and the dividers of its own workbook, so it can be followed from start to finish. Its Checks include each fuel's own, and check that both fuels are bought on the same day.
Abbreviations on the page have a dotted underline: hover over one, or tap it, to see what it means. The full list:
Every rate the calculator uses for each cost, for every period it covers (October 2026 to March 2030), with its status and source, exactly as in the workbook's source data tabs. In dual fuel, the electricity costs come first, then the gas costs.
The calculator works out each cost for your 12 months from its published charges and the way your use spreads across the day (or, for gas, the year), then adds the costs into one product: a total, a standing charge and a unit rate. Each section starts with a short summary; the detail and a worked figure for the South West follow.
Each cost is worked out as a fixed part and a unit part, and the Product tab adds them into a total, a standing charge and a unit rate, excluding VAT.
Every cost is calculated on its own tab as a fixed charge (pounds for the contract's days) and a unit charge (pounds for your consumption). The Product tab adds them: the standing charge is all the fixed charges × 100 ÷ the days in the contract, and the unit rate is all the unit charges × 100 ÷ your kWh. The supplier allowances follow Ofgem's own split: what Ofgem allows at nil consumption is fixed, the rest is per unit. All figures exclude VAT.
Economy 7 homes pay the same network rates as single-rate homes but use more at night, so less of their use falls in the dearer windows. Ofgem's multi-register figures and Elexon's profile class 2 capture that.
A multi-rate (Economy 7) home records its night-time use separately and uses much more of its electricity at night. The network charges themselves are the same for both meter types: the same DUoS rates and time bands, and the same TNUoS and BSUoS tariffs. What changes is the shape of demand, and so how much of the year's consumption falls in each band, window and season.
For wholesale energy, Ofgem's price cap method follows Ofgem's multi-register hedge, which gives night use no credit; the Elexon profile's fitted hedge prices each half-hour's share, so an Economy 7 home's night use is cheaper. For the South West from December 2026, a multi-rate home using 3,400 kWh pays £1,293.66 with Ofgem's price cap method and £1,208.58 with Elexon's profile class 2, about 38.0p and 35.5p per kWh, against about 41.9p for a single-rate home.
For the two Economy 7 profiles, the unit charges are also shown as a day rate and a night rate. Night is 00:30 to 07:30 GMT (01:30 to 08:30 during British Summer Time): Economy 7 meters switch on GMT, and these are the hours where Elexon's profile class 2 carries its night load. Real switching times vary by region and meter, so read the split as a guide.
The electric car and heat pump profiles are a typical home plus the added load, built from GB trials in Elexon's format. They are illustrative, and your consumption is split between the home and the added load in fixed proportions.
No GB body publishes ready-made profiles for homes with an electric vehicle or a heat pump, so the calculator builds three of its own, in the same format as Elexon's profiles (48 half-hours for each of 15 season and day types). Each describes the whole home after diversity, an average across many homes: Elexon's Profile Class 1, scaled to Ofgem's 2,500 kWh for a typical household, plus the added load.
Your consumption is shared out in fixed proportions. Each profile has a typical household and added load (2,500 kWh plus 2,200 kWh for an EV, or plus 3,500 kWh for a heat pump). Whatever consumption you enter is split in those proportions, so the household and the EV or heat pump always scale together; to model a different balance, enter the total of the two, or change the added kWh on the workbook's Profile tab.
The workbook's Profile tab builds each profile with formulas from these inputs, so every number can be traced and changed. The half-hourly shapes are calibrated to the largest GB trials and studies: Electric Nation and the Department for Transport's chargepoint analysis for EVs, and the RHPP heat pump trial and the Electrification of Heat Demonstration for heat pumps. They are syntheses rather than published tables, so treat them as illustrative.
For the South West from December 2026, the electric car home pays £1,817.35 when the car is charged on arrival and £1,579.71 with smart charging: smart charging moves the car out of DUoS's Red band, TNUoS's 4pm to 7pm window and the Capacity Market's winter peak, and into cheaper wholesale hours (16.02p per kWh of wholesale energy against 17.54p). The heat pump home pays £2,162.08.
The year's energy is bought all at once, by default on the last five working days up to the latest curve, equally weighted, each day priced with its own forward curve built from dated public quotes. A hedge, Ofgem's uplifts and each area's losses turn it into a cost.
Wholesale energy, which Ofgem calls direct fuel, is the electricity itself and the largest cost in the product. A supplier selling a 12-month fixed product buys the whole year's energy at once, on the day it prices the product. The calculator takes the last five working days up to the latest curve (weekdays that are not England and Wales bank holidays), now Thursday 12 November 2026, Friday 13 November 2026, Monday 16 November 2026, Tuesday 17 November 2026 and Wednesday 18 November 2026, and prices the year's energy on each of them with that day's own forward curve. By default the five days are weighted equally; in section 06 you can choose one of them instead, or any earlier saved settlement day, each priced with its own saved curve. Every start month is bought on the same days.
The buying day. Every buying day is already traded, so the cost is known for each; there is no range. With Last five days the hedge price is the average of the five days' hedge prices; choosing one day prices the energy on that day alone. Prices can move a lot within a week: for the example below, wholesale energy on a single day runs from £414.78 (Wednesday 18 November 2026) to £470.09 (Thursday 12 November 2026).
For the South West from December 2026, wholesale energy is £443.42 for the typical single-rate home (Ofgem price cap), 17.74p per kWh with Last five days, and £434.04 on Elexon's Profile Class 1. For a 3,400 kWh Economy 7 home it is 17.90p per kWh with Ofgem's method and 16.50p with Profile Class 2's fitted hedge.
DUoS pays for the local network: a fixed daily charge plus Red, Amber and Green unit rates, with each DNO setting its own times. The cost turns on how much of your use falls in each band.
DUoS (Distribution Use of System) pays for the local networks that carry power from the transmission system to homes. Each of the 14 distribution areas sets its charges every year under the CDCM (Common Distribution Charging Methodology). For a domestic home, single rate or multi rate, the tariff is "Domestic Aggregated or CT with Residual": a fixed charge per day, and unit rates for Red (peak), Amber and Green times of day.
Each DNO sets its own band times. In the South West in 2026/27, Red is 17:00 to 19:00 on weekdays and costs 22.754p per kWh, while Green costs 0.198p. So the calculation turns on how much of the year's use falls in each band.
Ofgem's method uses the price cap's national half-hourly shares of demand; the Elexon method applies the settlement profile day by day. Both use each DNO's own bands and rates.
For the South West from December 2026, DUoS is £136.51 with Annex 3 and £140.47 with the Elexon profile; almost all of the gap comes from the Red band.
TNUoS pays for the national grid: a fixed daily residual, the same everywhere, plus a regional unit rate on your use between 4pm and 7pm. The methods differ only in that 4pm to 7pm share.
TNUoS (Transmission Network Use of System) pays for the national high-voltage network, and NESO sets it. A domestic customer pays two parts:
The method decides what share of your consumption falls between 4pm and 7pm. Ofgem Annex 3 uses the price cap's single share, 17.45% for a single-rate home (14.33% for multi rate), and reproduces Ofgem's published TNUoS figure in all 14 regions. Elexon profile takes it from the profile day by day: 18.5% for a contract from December 2026, and more in the winter half. For the South West from December 2026, TNUoS is £105.26 with Annex 3 and £105.82 with the Elexon profile; most of it is the residual.
BSUoS pays NESO's cost of balancing the system: a flat rate per MWh, set for six-month periods and the same at every hour. The methods differ only in how your use splits between the periods.
BSUoS (Balancing Services Use of System) pays NESO's costs of balancing the system second by second. Since April 2023 it is a fixed tariff in £ per MWh, the same at every time of day and in every region, set for six-month tariff periods: April to September and October to March. NESO numbers these tariffs from Tariff 1 (April to September 2023), so April to September 2026 is Final Tariff 7; the calculator continues the numbering for the assumed periods, Tariffs 11 to 14. There is no fixed charge. Consumption is grossed up for transmission and distribution losses with Ofgem's BSUoS loss multiplier for the region (from 1.08 in North Scotland to 1.17 in North Wales & Mersey), which is the only reason BSUoS differs between regions.
Because the rate is flat through the day, the method only decides how your consumption splits between tariff periods. Ofgem Annex 3 splits it by Ofgem's summer and winter shares of demand (each BSUoS tariff is exactly one Ofgem season) and reproduces Ofgem's published BSUoS figure in all 14 regions. Elexon profile splits it by the consumption the profile places in each period, so winter periods weigh more. For the South West from December 2026, BSUoS is £57.21 with Annex 3 and £57.07 with the Elexon profile: both put more of the year's use in the winter tariff, which is the cheaper one here. When every period in the 12 months has the same tariff, the two methods give the same result.
The Capacity Market charge is paid on your use in the winter peak (4pm to 7pm on working days, November to February), at LCCC's monthly cost over the peak demand. It is the cost where the profile matters most.
The Capacity Market pays power stations, storage and demand response to be available when the system is under most pressure. Its cost is recovered from suppliers through the CM supplier charge, in proportion to their customers' use in the winter peak: 4pm to 7pm (settlement periods 33 to 38) on working days from November to February, excluding bank holidays. The scheme runs in delivery years from October to September.
For each month of your contract, the calculator takes LCCC's forecast scheme cost for that month, adds a twelfth of the Settlement Costs Levy, and divides by the delivery year's winter peak demand, giving a rate in £ per MWh of peak demand. Your cost is that rate × your winter-peak share (the share of your year's use that falls in the winter peak) × your consumption × a loss multiplier for the region. The methods differ only in that share:
This is the cost where the profile matters most. For the South West from December 2026, it is £46.87 for the typical single-rate home (Ofgem price cap), £103.91 for the electric car home charged on arrival and £53.70 for the smart-charging one. Elexon's Profile Class 2 puts less of an Economy 7 home's use in the winter peak (3.2%) than Ofgem's multi-register share does (4.2%), so the two methods differ noticeably for Economy 7.
The CfD levy funds low-carbon generators' guaranteed prices: LCCC's quarterly rate on all your use. It falls as wholesale prices rise, so LCCC's forecasts are repriced to the same forward curve as the wholesale cost.
Contracts for Difference give low-carbon generators a guaranteed "strike" price: when the market price is below it, the scheme pays them the difference, and when it is above, they pay back. Suppliers fund it through the CfD levy, a rate per MWh of their customers' use that LCCC sets each quarter (the Interim Levy Rate), plus a small Operational Costs Levy for each fiscal year. Because it is charged on all use at any time of day, only the season matters, not the time of day.
The calculator takes LCCC's levy rate for each quarter of your contract (set by LCCC for the nearest quarters, then LCCC's base-case forecasts repriced to the forward curve, as explained below) and adds that fiscal year's operational levy. Each quarter is weighted by its share of your consumption, and the weights add up to 100% over your 12 months; a quarter you hold only part of counts in proportion to its days. The cost is the weighted rate × your consumption × a CfD loss multiplier for the region. The methods differ only in the weights:
A CfD pays its generators the strike price minus the market price for every MWh they produce, so when wholesale prices rise the payments, and the levy that funds them, fall; above the strike price generators pay money back. LCCC's base-case forecasts from April 2027 are priced at the forward prices of its market reference date at the end of August 2026, but the calculator prices your wholesale energy from newer curves: those of the five buying days (12 to 18 Nov 2026), or of the one you choose under "Bought on". Using LCCC's rates unchanged would mix two price dates: today's prices in the wholesale cost, but August's in the CfD levy that offsets them.
So each forecast quarter is repriced to the same curves, the five buying days' season prices averaged, or the chosen buying day's: repriced rate = LCCC's rate − output share × (curve season price − LCCC's reference price). The output share is the CfD plants' output over all the demand that pays the levy, from LCCC's own base case: wind and solar output × 0.85 (they are settled on day-ahead prices in the hours they generate, which move a little less than baseload), plus Drax's low-carbon dispatchable CfD from April 2027. It runs from 13% to 19%, so each £10/MWh on the season price moves the levy by about £1.31 to £1.95 per MWh. Seasons are compared with seasons: April to September quarters with that summer's price, October to March quarters with that winter's. The reference prices are Sum-27 £99.56, Win-27 £100.22 and Sum-28 £67.25; the five buying days' curves average Sum-27 £123.91, Win-27 £120.30 and Sum-28 £73.44. For example, for April to June 2027, LCCC's £6.321 − 13.09% × (£123.91 − £99.56) = £3.135 per MWh. Assumed quarters from October 2028 keep the output, demand and reference price of the LCCC quarter they repeat and take the curve price of their own season, so a lower curve price there raises them. Rates already set by LCCC are not repriced.
At the buying days' curves (12 to 18 Nov 2026, averaged), repricing lowers the CfD levy for the South West example from December 2026 by £5.89, from £17.69 with LCCC's own rates; for a contract from April 2027 it is £14.18 against £24.17. As a cross-check, LCCC's low case is close to the repriced rates for April 2027 to March 2028. The working is on the CfD Data tab of the workbook, rebuilt with formulas from LCCC's figures, the latest curve's monthly prices and each buying day's season prices, and checked against the engine; the Cost rates panel shows it too. Each refresh reprices again, so the CfD levy moves against the wholesale cost as prices move.
For the South West from December 2026 the CfD levy is £11.80 for the typical single-rate home (Ofgem price cap), and £22.05 for either electric car home: smart charging makes no difference here. The repriced rates rise from 2028, as the forward curve falls and new CfD wind farms add output. As in Ofgem's method, the Total Reserve Amount that LCCC also collects (and returns if it is not needed) is excluded.
RO, FiT and AAHEDC are charged per unit at any time of day, so only the season matters. Their rates after March 2027 are assumed, uplifted by RPI.
These three policy costs are all charged per unit of electricity, at any time of day, so the profile matters only through the season. Each has its own block on the workbook's Policy and Policy Data tabs.
Each day of your contract carries its scheme's rate and a weight, scaled to add up to 100% over your 12 months:
For the South West from December 2026 the three come to £39.32 for the typical single-rate home (Ofgem price cap): RO £17.98, FiT £20.12 and AAHEDC £1.22. Every profile pays about 1.6p per kWh in all.
WHD funds a rebate for eligible households and NCC funds network charge discounts for energy intensive industries. Both are charged per unit and weighted by season.
Two more policy costs from Ofgem's Annex 4, each with its own block on the workbook's Policy and Policy Data tabs:
Both use Ofgem's seasons, weighted by Ofgem's shares of annual demand (Ofgem price cap) or the profile's own consumption, exactly as for RO, FiT and AAHEDC. The workbook reproduces Ofgem's WHD rate and its regional NCC rates after losses.
For the South West from December 2026, for the typical single-rate home (Ofgem price cap), WHD is £13.65 and NCC £5.03. NCC ranges from £4.85 in North Scotland to £5.26 in North Wales & Mersey because of losses.
The nRAB levy funds Sizewell C while it is built. It works like the CfD levy: LCCC's quarterly rate on all your use, uplifted by losses.
The Nuclear Regulated Asset Base pays for building the Sizewell C nuclear power station while it is under construction, rather than only once it generates. Suppliers fund it through the nRAB levy, which works like the CfD levy: a rate per MWh of their customers' use that LCCC sets each quarter (the Interim Levy Rate), plus a small Operational Costs Levy for each fiscal year, uplifted by each area's losses. LCCC has set the rate for October to December 2026 (£3.754 per MWh) and forecasts the rest to January to March 2028.
The calculator takes LCCC's rate for each quarter of your contract and adds the operational levy. Each quarter is weighted by its share of your consumption, scaled to 100% over your 12 months, and the cost is the weighted rate × your consumption × the region's loss multiplier. The methods differ only in the weights:
For the South West from December 2026 the nRAB levy is £11.27 for the typical single-rate home (Ofgem price cap), about 0.45p per kWh for every profile: £21.28 for either electric car home at 4,700 kWh and £26.75 for the heat pump home at 6,000 kWh. LCCC's rates are higher in summer than in winter, so winter-heavy homes pay slightly less per kWh.
Ofgem allows a supplier amounts for its own costs and margin, at nil and at benchmark consumption, for each payment method. The product carries five of them, priced as in Ofgem's cap model; headroom is left out.
Beyond the network and policy costs, Ofgem's price cap allows a supplier seven amounts for its own costs and margin. A fixed product carries five of them: smart metering is folded into operating costs, and headroom is left out. Each is set per customer per year at nil consumption, which becomes the standing charge, and at benchmark consumption (2,500 kWh single rate, 3,400 kWh multi rate), separately for each payment method, every cap quarter. The calculator follows Ofgem's cap model (v1.31) and reproduces its published October to December 2026 values exactly, in every region, for both meter types and all three payment methods.
For your product, each pound allowance follows Ofgem's pattern: the nil value for the days you hold in each quarter goes into the standing charge, and the difference between benchmark and nil, ÷ the benchmark kWh × your kWh, weighted by your use in each quarter, into the unit rate. Debt and EBIT apply their percentages to the product's own other costs, with their standing charge part following Ofgem's nil approach. Levelisation is a property of the cap rather than of one product, so it is recalculated each quarter on the cap's own October to December 2026 costs, with Ofgem's October 2026 customer numbers.
For the South West from December 2026, for the typical single-rate home (Ofgem price cap), the five come to £177.74 for Direct Debit, £257.33 for Standard Credit, where bad debt adds most, and £152.38 for Prepayment, where levelisation, lower bad debt and the larger smart metering credit more than offset higher operating costs.
The CSS Benchmark tab sets the allowances beside suppliers' published costs and margins. It is a reality check only: nothing on it feeds the price.
Large suppliers publish a Consolidated Segmental Statement (CSS) each year, with their domestic electricity revenue, costs, EBIT, volume and meter points. The workbook's CSS Benchmark tab sets five of them, British Gas, EDF, E.ON and ScottishPower for 2024 and Octopus for the year to April 2025, beside the cap's allowances and your product's, per meter point and per MWh, with the 2024 figures uplifted by CPIH. It is a reality check, not an input: nothing on it feeds the price.
The four suppliers that publish meter points reported indirect costs of about £114 per meter point on average in 2024 (about £121 in 2026/27 prices), close to the cap's £124 of operating costs (with smart metering) and debt-related costs for South West Direct Debit. Their EBIT averaged about £38 per meter point, and the five suppliers' margin 3.9%, against the cap's £23 and 2.7%. The comparison is approximate: suppliers classify costs differently, and a CSS covers all of a supplier's tariffs, payment methods and regions.
A home's gas supply point has an annual quantity and a peak-day capacity, which the capacity charges are based on. Xoserve's profile or Ofgem's method spreads the costs over the year.
A domestic gas meter is a supply point in Xoserve's end user category band 1 (up to 73,200 kWh a year). Its annual quantity is your consumption; its peak-day quantity (SOQ) is the annual quantity / (365 × the band's load factor), which Xoserve publishes for each LDZ, for credit and prepayment meters. The capacity charges are priced on the SOQ, so a capacity rate costs rate × consumption / load factor / 100 a year. For 9,500 kWh in the South West the SOQ is 96.4 kWh a day.
As in the price cap, every network charge is in the unit rate (Ofgem's gas cap has no network standing charge). For the South West from December 2026, 9,500 kWh on Direct Debit costs £1,082.82 on the Xoserve profile (26.53p a day and 10.379p per kWh) and £1,069.47 with Ofgem's method.
The gas network charges come from the distribution networks (the LDZ charges) and from National Gas Transmission (the NTS charges). All of them are in the unit rate, as in the price cap.
Gas reaches a home through National Gas Transmission's high-pressure NTS and then one of 8 distribution networks (Cadent's four, Northern Gas Networks, SGN's Scotland and Southern, and Wales & West Utilities), which cover the 13 LDZs.
The distribution charges for 2026/27 are each network's final charging notice, identical to Ofgem's gas Annex 3; ECN and NTS Commodity are National Gas's October 2026 notices. For 2027/28, all 8 networks have published indicative notices (October and November 2026); their final notices follow by 1 February 2027. Later years grow each network's latest notice with its allowed revenue in Ofgem's RIIO-3 Final Determinations, and ECN with National Gas's indicative reserve prices. For the South West from December 2026 the network costs come to £209.81. The workbook's Gas Network Ofgem Check rebuilds Ofgem's published October to December 2026 network allowance for every region and both payment groups.
Wholesale gas is priced from an NBP forward curve built the same way as electricity's, with a monthly shape from 17 years of spot prices, on the same buying days.
Wholesale gas is bought at the NBP (National Balancing Point), in pence per therm (£/MWh = p/therm × 10 / 29.3071). The calculator keeps a dated snapshot of NBP settlement prices, the same date as electricity's, and builds a monthly curve: a month quote sets its month, and a quarter or season quote is shared between its other months by the gas monthly shape, so every quote is reproduced. The shape is the median, over the 17 gas years from 2009/10 to 2025/26, of each month's spot price against its quarter's and its season's (Ofgem's day-ahead series to 2017, then National Gas's System Average Price): winter peaks in December and January, summer is lowest in June and rises into September. A median keeps one-off shocks, such as autumn 2021, winter 2022 and March 2026, out of it.
The hedge follows the gas profile (Ofgem's quarter weights, or your month-by-month use), with Ofgem's uplifts for re-hedging, imbalance, transaction costs and risk (plus quarterly-to-monthly shaping for Ofgem's method), then unidentified gas, the gas lost or unaccounted for on the networks. With Ofgem's own index, the same steps rebuild Ofgem's published October to December 2026 gas allowance exactly. For the South West from December 2026, wholesale gas is £672.42 (7.078p per kWh) with all five buying days.
The buying days are the same as electricity's: the last five working days up to the latest curve, each priced with that day's own NBP curve (filled in the same way where a day's sources quote fewer contracts), all five weighted equally, or one day chosen in section 06 (including an earlier saved day). In dual fuel, both fuels are bought on the same day. For the example, wholesale gas on a single day runs from £629.24 (Wednesday 18 November 2026) to £713.43 (Thursday 12 November 2026).
The gas policy costs are the Green Gas Levy and the gas Warm Home Discount. The gas supplier allowances follow Ofgem's cap model, as for electricity.
For the South West from December 2026: policy costs £22.18, supplier allowances £178.42.
A dual fuel product adds the electricity and gas products for the same home, both bought on the same day. The totals and standing charges add; each fuel keeps its own unit rate.
A dual fuel product is the electricity product and the gas product for the same home, region, payment method and start, added together: the total and the standing charges add; each fuel keeps its own unit rate. For the South West from December 2026 (typical single-rate home, Ofgem price cap, 2,500 kWh; Xoserve gas, 9,500 kWh) it is £2,130.90, with standing charges of 88.53p a day together.
Both fuels are bought on the same day, chosen once in section 06, so their wholesale costs move together from one buying day to the next. For the example, the dual fuel product on a single day runs from £2,057.51 (Wednesday 18 November 2026) to £2,200.13 (Thursday 12 November 2026). The Dual Fuel Product tab links the buying day in from both fuels' Inputs tabs, and its Checks tab checks that they are the same.
Network charges change every 1 April, so a contract usually spans two charging years. Fixed charges follow the days and unit charges your consumption, each cost on its own calendar.
Network charges run from 1 April to 31 March, so a 12-month contract usually falls partly in one charging year and partly in the next.
Each region is priced in full and the 14 results are averaged, each counting equally; rates are never averaged first.
Each region is priced in full, with its own charges and time bands, and the 14 results are averaged, each counting equally. Rates are never averaged first, because every DNO puts its bands at different hours. For the typical single-rate home (Ofgem price cap) from December 2026, on Direct Debit, the average product is £1,034.93, from £994.45 in the East Midlands to £1,117.44 in North Wales & Mersey. Debt and EBIT are worked out on each region's own costs, and levelisation on each region's cap.
Every figure comes from a published source, listed below by cost and named next to the figure in the workbook.
| Cost | Sources |
|---|---|
| Wholesale energy | Forward settlement prices for the five buying days, Thursday 12 November 2026, Friday 13 November 2026, Monday 16 November 2026, Tuesday 17 November 2026 and Wednesday 18 November 2026 (the latest, 18 November 2026, sets the curve shown; earlier snapshots are kept), from Smart Energy's Market Desk, Prestige Business Solutions and Purely Energy, with Catalyst Commercial's market reports and Smart Energy's daily report for the earlier buying days, and Catalyst's reports for the dated quotes from July to October 2026; Elexon's Market Index Data (MD1 settlement files, August 2021 to October 2026) for the monthly shapes, peak/baseload ratios, profile shape factors and shape analysis; and Ofgem's Annex 2 v1.30 (tabs 1a, 1b and 3b) for the hedge, demand weights, uplifts, losses and published allowance. |
| DUoS 2026/27 and 2027/28 | Each DNO's Schedule of Charges, CDCM Annex 1. |
| DUoS 2028/29 and 2029/30 | Indicative figures from the DCUSA Cost Information Review Packs (September 2026), with each DNO's 2027/28 time bands carried forward. Electricity North West's pack gives 2028/29 only, so its 2029/30 figures are kept from the earlier pack. |
| TNUoS | 2026/27: NESO's final TNUoS tariffs for 2026/27. 2027/28 to 2029/30: NESO's Five-Year View of TNUoS Tariffs (September 2026), whose 2027/28 figures update NESO's April 2026 initial forecast. |
| BSUoS | NESO's Final Tariffs 7 and 8 (published 29 December 2025) for April 2026 to March 2027; for April 2027 to March 2028, NESO's forecast tariffs from its BSUoS Forecast for November 2026 (27.06 £/MWh for April to September 2027 and 21.45 £/MWh for October 2027 to March 2028), which include the under-recovery NESO expects to carry forward and replace its Draft Tariffs 9 and 10 (21.67 and 18.42 £/MWh, published 21 September 2026) until the final tariffs in December 2026; and from April 2028 an assumption that repeats NESO's last forecast year with its seasonal pattern and no carry-forward: 16.78 £/MWh in summer (NESO's forecast tariff for April to September 2028) and 15.90 £/MWh in winter (its cost forecast for October 2027 to March 2028). |
| Settlement profile | Elexon's load profiles by profile class, from the UKERC Energy Data Centre; profiling is explained by Elexon. |
| Ofgem inputs and published figures | Ofgem, Annex 3 network cost allowance methodology (electricity), v1.25: tabs 3a (shares of demand), 3b (loss multipliers), 3c (TNUoS charges), 3e (BSUoS charges), 3f (DUoS charges), and 2a, 2b and 2c (published figures). |
| Electric car and heat pump profiles | Calibrated to Electric Nation (WPD and EA Technology), DfT Electric Chargepoint Analysis 2017, the Electric Vehicles (Smart Charge Points) Regulations 2021, Ofgem's State of the Market Report (January 2026), the National Travel Survey 2024, Love et al. (2017) on the RHPP heat pump trial, the Electrification of Heat Demonstration (Energy Systems Catapult for DESNZ, 2024) and ERM's analysis for UK Power Networks (2024). |
| Capacity Market | LCCC's monthly forecast of Capacity Market costs (September 2026 to August 2028), LCCC's Settlement Costs Levy budgets, and Ofgem's Annex 2 wholesale cost allowance methodology v1.30 (tabs 4a, 5b, 6a, 6d and 6e) for winter peak demand, the winter-peak shares, loss multipliers and published figures; bank holidays from GOV.UK (England and Wales). |
| CfD | LCCC's CfD scheme dashboard (15 September 2026): the Interim Levy Rate by quarter (set rates to January to March 2027, then base-case forecasts to July to September 2028) and the Operational Costs Levy by fiscal year; LCCC's CfD Two Year Forecast (data portal, 3 November 2026, the same base case) for the CfD and Drax output, the eligible demand and the low and high cases used in the repricing; Catalyst Commercial's baseload settlements of 27 August and 2 September 2026 for the reference prices; and Ofgem's Annex 2 v1.30 (tabs 7a to 7d) for the quarterly demand weights, CfD loss multipliers and published figures. |
| RO, FiT and AAHEDC | Ofgem's Annex 4 policy cost allowance methodology v1.25 (tabs 2a, 3b, 3g, 3h and 3i) for the 2026/27 RO level and buy-out price, FiT rates, AAHEDC loss multipliers and Ofgem's rates; DESNZ's calculation of the 2027/28 RO level (0.369 ROCs per MWh); NESO's AAHEDC Charging Statement for 2026/27 (Issue 21); and the OBR's March 2026 RPI forecast. |
| WHD | Ofgem's Annex 4 v1.25 (tabs 2a and 3f): the 2026/27 target spending, obligated suppliers' electricity supply, Ofgem's rate and the 2026/27 amount per customer. |
| NCC | Elexon's Estimated Levy Fund by claim month (July 2025 to April 2026); Ofgem's Annex 4 v1.25 (tabs 2a, 3h and 3k) for the administrative costs, reserve fund, loss multipliers and Ofgem's regional rates; and eligible demand from LCCC's CfD scheme dashboard (15 September 2026). |
| nRAB | LCCC's nRAB scheme dashboard: the Interim Levy Rate set for October to December 2026, then LCCC forecasts to January to March 2028; and Ofgem's Annex 4 v1.25 (tabs 2a, 3a, 3h and 3l) for the operational levy, quarterly demand weights, loss multipliers and Ofgem's regional rates. |
| Supplier allowances | Ofgem's Default tariff cap level model v1.31 (tabs 3g CPIH, 3i SMNCC, 3k EBIT, 3l HAP, 3m CO, 3n DRC, 3o IC and the calculation tabs); Annex 5 v1.22 (the DCC method and nil scaling); Annex 9 v1.11 (levelisation and customer accounts); Ofgem's August 2026 SMNCC update for April to September 2027; Smart DCC's Indicative Charging Statement for 2027/28 (Issue 3.0); ONS CPIH (series L522) to June 2026; and the OBR's Long-term economic determinants (March 2026) for CPIH after that. |
| CSS benchmark | The Consolidated Segmental Statements of British Gas, EDF, E.ON and ScottishPower for 2024, and of Octopus Energy for the year to 30 April 2025. |
| Wholesale gas | NBP forward settlement prices for the same five buying days, from the same reports as electricity (Smart Energy's Market Desk, Catalyst Commercial, Prestige Business Solutions and Purely Energy); Ofgem's gas Annex 2 v1.30 for the quarter demand weights, uplifts and unidentified gas; Ofgem's gas day-ahead contract (Wholesale Market Indicators, monthly) and National Gas Transmission's System Average Price of gas (via ONS) for the monthly shape. |
| Gas network | The April 2026 final charging notices of Cadent, Northern Gas Networks, SGN and Wales & West Utilities, checked against Ofgem's gas Annex 3 v1.21; the indicative notices for 1 April 2027 of Cadent (its four networks), Northern Gas Networks, SGN Scotland, SGN Southern and Wales & West Utilities (Wales & West's SoLR charge is to be confirmed, so nil is used; Cadent's is preliminary); National Gas Transmission's October 2026 notices for NTS exit capacity and NTS Commodity; Ofgem's RIIO-3 Final Determinations gas distribution financial model for years without notices; Xoserve's load factors and annual load profiles for gas year 2026/27 (LF26, ALPDAF26); the CMA's region to LDZ shares as used by Ofgem. |
| Gas policy and supplier costs | DESNZ's Green Gas Levy rates; Ofgem's Annex 4 v1.25 for the gas WHD; HM Treasury's Budget 2026 (28 October 2026) for the Gas Shipper Obligation being scrapped; Ofgem's cap model v1.31, Annex 5 v1.22, Annex 9 v1.11 and the 2026 smart metering update for the gas supplier allowances. |
Every figure in the workbook names its source next to it.
The main assumptions: forward prices are a dated snapshot, later years rest on forecasts or carried-forward rates, and every profile describes a typical home.
| Area | Assumption or limitation |
|---|---|
| Wholesale energy | Forward prices are a dated snapshot of public broker and supplier reports rather than exchange settlement files, and move every day; peak prices come from four years of peak/baseload ratios; the year's energy is bought all at once on the buying day (by default the last five working days up to the latest curve), so a contract starting a year or more ahead is priced on today's forward prices with no allowance for how they may move; a contract not quoted on an earlier buying day is filled from a neighbouring day's curve by the move of the nearest quoted contract, which follows that day's front of the curve and can overstate the move of far contracts; and Ofgem's October to December 2026 uplifts, demand weights and losses apply to every start. |
| Indicative and forecast years | They may change: DUoS for 2028/29, the first year of the next price control (RIIO-ED3), and TNUoS from 2027/28. |
| Carried-forward inputs | DUoS time bands for the indicative years, and Ofgem's October to December 2026 shares of demand and loss multipliers for later years. Ofgem's summer and winter shares of demand are applied to every year. |
| North West DUoS for 2029/30 | Electricity North West's September 2026 pack gives 2028/29 only, so 2029/30 keeps the figures from its earlier pack. |
| BSUoS from April 2027 | NESO's November 2026 forecast tariffs, which NESO itself calls highly indicative until it publishes the final tariffs in December 2026, and from April 2028 an assumption (16.78 £/MWh in summer, 15.90 £/MWh in winter); Ofgem's October to December 2026 BSUoS loss multipliers are used for later periods. |
| TNUoS charging basis | The non-half-hourly basis that Annex 3 uses. Market-wide half-hourly settlement may change how domestic TNUoS is charged. |
| A typical customer's shape | Both methods describe an average home; any real household will differ. Profile Class 2 is Elexon's national average for Economy 7, and actual off-peak times vary by region and meter. |
| Electric car and heat pump profiles | They are illustrative: the trial cohorts were early adopters, EV seasonality and the smart-charging mix are assumptions, and heat pump efficiency varies widely between homes. |
| Capacity Market | September 2028 uses September 2027's cost; delivery years 2028/29 and 2029/30 repeat 2027/28's monthly costs; winter peak demand from 2027/28 is carried forward from 2026/27; the 2029/30 levy repeats 2028/29's; and the 2027/28 forecast does not yet include that year's T-1 auction. |
| CfD | LCCC's forecasts are repriced to the forward curve with LCCC's own output and demand, a capture factor of 0.85 for wind and solar and reference prices estimated for LCCC's market reference date at the end of August 2026 (Sum-27 £99.56, Win-27 £100.22 and Sum-28 £67.25). LCCC does not publish those prices, and the front contracts rose about 7% between 27 August and 2 September, so the repricing may understate the cut for 2027 if LCCC used earlier prices. October 2028 to March 2030 repeat LCCC's forecast levy rates for October 2027 to September 2028, keeping the seasonal pattern, repriced to their own season's curve price; the 2029/30 operational levy repeats 2028/29's; and the Total Reserve Amount is excluded, as in Ofgem's method. The repricing is a linear estimate of how LCCC's payments move with prices: LCCC sets each quarter's actual rate about three months ahead at the prices of its own reference date, can adjust a rate within a quarter (as it did in August 2026), and the strike prices, output and dispatch of Drax can differ from its base case. |
| RO, FiT and AAHEDC | The government's funding of 75% of RO costs continues; the RO buy-out price, FiT rates and the AAHEDC tariff are uplifted each April by the previous calendar year's RPI forecast; the RO level for 2028/29 and 2029/30 repeats 2027/28's 0.369 ROCs per MWh (0.394 if the industrial exemption takes effect in April 2027); and FiT repeats the 2026/27 summer and winter pattern. |
| WHD | The 2026/27 rate of £5.006 per MWh is carried forward unchanged, with no inflation uplift, to 2029/30, as if the scheme's spending and electricity supply stay as they are; the £3.41 per customer applies to 2026/27 only. |
| NCC | Every six-month period's levy fund is April 2026's £39.77m × 6, reflecting the compensation of 90%; Elexon's administrative costs and the reserve fund are carried forward from Ofgem's October 2026 cap; from October 2028 eligible demand repeats October 2027 to September 2028. |
| nRAB | April 2028 to March 2030 repeat LCCC's forecast levy rates for April 2027 to March 2028, keeping the seasonal pattern; the operational levy of 0.0063 £/MWh for 2026/27 is carried forward; and Ofgem's 2026/27 demand weights and loss multipliers apply to later years. |
| Supplier allowances | CPIH after June 2026 grows at the OBR's fiscal-year forecasts (2.25% in 2026-27, then about 2.1% a year); the 12.67% cost of equity is held, so the EBIT percentage and the working capital rates do not change; the smart metering part of operating costs holds its April to September 2027 values from October 2027; DCC from April 2027 comes from DCC's indicative 2027/28 charges and is then held, with Smart Energy GB, Elexon, RECCo and DCUSA carried forward; and levelisation uses the cap's October to December 2026 costs and Ofgem's October 2026 customer numbers. |
| Headroom | Left out of the product, as a price cap allowance for forecasting risk rather than a cost; the wholesale cost carries its own risk premium instead. |
| Gas | The 2027/28 charges from the indicative notices may change in the final notices (by 1 February 2027); in a year without a network's own notice its latest notice grows with its allowed revenue, and ECN with National Gas's reserve prices; load factors and load profiles repeat gas year 2026/27; the Green Gas Levy and gas WHD carry forward their 2026/27 rates; the gas monthly shape uses spot prices as a stand-in for the forward market's shape. The Budget of 28 October 2026 asked Ofgem to remove the gas standing charge "in 2027 or as soon as possible after", moving its costs to the unit rate; no date or design is set, so gas is still priced with a standing charge (the "Recovered in" choice in section 07 can move each gas cost to the unit rate). |
| Dual fuel | Both fuels are bought on the same day; a supplier can buy power and gas on different days, which the calculator does not model. |
| Percentage allowances | Debt and EBIT apply to the product's own other costs, wholesale energy included, so they follow today's forward prices rather than those behind the cap, and they move if you untick a cost. |
The Checks tab compares every cost with an independent calculation and with Ofgem's published figures; ALL CHECKS PASS means everything ties out.
The Checks tab opens with the status and the number of checks failing, then links to the tabs after the Check workings divider that hold the workings behind some of the checks. Step 1, By cost, lists each cost with how many checks it has, how many fail, and Pass or Review; Step 2 lists each cost's total from an independent calculation, written separately from the workbook's formulas; and Step 3 is every check, grouped by cost, each of which should be zero. Any that is not turns red, the count of failing checks goes up, and the status changes from ALL CHECKS PASS to REVIEW. Each calculation tab's At a glance also shows Pass or Review for its own cost. The checks confirm, depending on your choices, that:
The page runs the same comparisons as you change the inputs, and shows a warning in the results panel if a check ever fails. The CSS Benchmark tab is a comparison, not a check: differences there are expected.
One self-contained web page: the data and the pricing engines are built into it, and every figure is worked out in your browser.
Languages. The pricing engines, the page and the Excel writer are JavaScript, with no framework or library; the page itself is HTML and CSS. Python reads the published source files (Ofgem's annexes, the network companies' and NESO's charging statements, and Elexon, Xoserve and LCCC data) into data files, and a short shell script runs each refresh.
Building the page. Each refresh turns the latest forward settlement prices into monthly power and gas curves (keeping every saved day for the price history), rebuilds the cost data, and puts the data and the engines into this one file of about 2.2 MB. The engines in the page are the same code the refresh tests, so the page and its tests cannot drift apart.
How it responds. Every change to the form reruns the engine for your product and for all 14 regions, then redraws the results panel and sections 07 to 11; the bars and charts are drawn directly on the page. The price history is worked out one saved day at a time in the background, so the page stays responsive. What you enter is not sent anywhere.
The Excel workbooks. The page writes each workbook itself, with no add-on: it builds the spreadsheet's XML parts, packs them into a zip file and hands it to your browser as a download. The full workbook (Download XLSX) rebuilds the whole calculation in live Excel formulas, with the checks above; each formula also stores its value, so the file reads correctly before Excel recalculates it on opening. The Excel button by each table or graph does the same for that one table, with a native Excel chart where the page draws one.
Testing. A refresh is published only when: